Parker Middle School
Construction Project
Community Forum #6
October 7, 2026
School Building Committee Meeting
October 7, 2026
School Building Committee Meeting
September 17, 2026
School Building Committee Meeting
August 20, 2026
School Building Committee Meeting
July 16, 2026
Community Forum #5
June 10, 2026
School Building Committee Meeting
June 10, 2026
School Building Committee Meeting
May 21, 2026
School Building Committee Meeting
April 16, 2026
Community Forum #4
March 19, 2026
School Building Committee Meeting
March 19, 2026
School Building Committee Meeting
February 19, 2026
School Building Committee Meeting
January 15, 2026
School Building Committee Meeting
December 18, 2025
Community Forum #3
December 17, 2025
Community Forum #2
November 20, 2025
School Building Committee Meeting
November 20, 2025
Community Forum #1
October 22, 2025
Click to watch the video and learn about the project and the MSBA grant opportunity.
PROJECT UPDATE
On October 7, 2026 the sixth community forum for the project was held at the Elks Building in Chelmsford. To access the presentation, please click below.
Grade Configuration
Superintendent Dr. Jay Lang explains in the video clip below why the Grade 4–6 configuration was selected for the new Parker Middle School, and how it addresses districtwide challenges while creating new opportunities for students and the community.
To view the clip, please click below.
New Site Plan
The design team has developed a proposed site plan for the new Parker Middle School campus. The plan locates the new school building along Crooked Spring Road while providing adequate parking, dedicated parent pick-up and drop-off areas, bus circulation lanes, improved traffic flow, athletic fields, courts, playgrounds, open green space, and a natural restoration area surrounding the stream that currently runs beneath the existing Parker School building.
To view a larger version of the image, please click below.
PROJECT INTRODUCTION
Welcome to the Colonel Moses Parker Middle School Project website! This site is your resource for information about the project, the partnership with the Massachusetts School Building Authority (MSBA), the feasibility and schematic design process, and upcoming steps.
The Chelmsford Public School District currently serves approximately 5,068 students in grades PK–12, with enrollment expected to grow steadily through the 2033-34 school year. The district operates four elementary schools serving 1,922 K–4 students, along with a separate school for 158 PK students. These elementary schools vary in size, age, and condition.
At the middle school level, Parker Middle School serves 778 students in grades 5 and 6, while McCarthy Middle School serves 808 students in grades 7 and 8. Chelmsford High School serves 1,402 students in grades 9–12.
Originally constructed in 1965 and opened in 1967, Parker Middle School is a three-story, cast-in-place concrete structure with a masonry veneer exterior. The school encompasses approximately 109,300 gross square feet, excluding modular classrooms. The original building was designed to accommodate 684 students, based on general classroom counts, not including modular additions. In April 2023, the Town of Chelmsford submitted a Statement of Interest to the MSBA, identifying various facility challenges at the Colonel Moses Parker Middle School. The MSBA is an independent public authority that partners with districts across Massachusetts to fund and manage school construction and renovation projects. In December 2024, the MSBA Board voted to invite Chelmsford into the feasibility study phase, launching a collaborative process to assess possible solutions for Parker Middle School.
The feasibility study will address the identified facility challenges, assess a range of options and enrollment scenarios, select a preferred solution, and develop a detailed schematic design. The preferred option is expected to be presented to the Town in April 2027 for consideration of full funding to complete design and construction.
In collaboration with the MSBA, the study will evaluate the renovation of the existing school, an addition/ renovation to the existing school, and/or new construction. In addition, the feasibility study will examine three (3) enrollment options agreed upon with the MSBA including the current grade 5 and 6 enrollment configuration (930 students), a proposed grade 4 through 6 enrollment configuration (1,390 students), and/or a proposed grade 5 through 8 enrollment configuration consolidating Parker Middle School with McCarthy Middle School (1,885 students).
Milestone Activities
Module 1: Eligibility Period
Module 2: Forming the Team
FEB 2025 – MAY 2025
OPM Selection
JUN 2025 – SEP 2025
Designer Selection
Module 3: Feasibility Study
SEP 2025 – JAN 2026 (Estimated)
Preliminary Design Proposal (PDP)
FEB 2026 – APR 2026 (Estimated)
Preferred Schematic Report (PSR)
Shortcuts
MSBA WEBSITE
Click here for more information about funding and the MSBA process
GLOSSARY OF TERMS
Click here for a guide to clarify common terms used in the building process for public projects.