Parker Middle School 
Construction Project

Glossary of Terms

MSBA: Massachusetts State Building Authority

MSBA is the authority acting on behalf of the Commonwealth of Massachusetts partnering with Massachusetts communities to support the design and construction of educationally-appropriate, flexible, sustainable, and cost effective public school facilities. MSBA works with municipalities for the life of the project from Pre-Feasibility through Building Completion and Closeout.

MSBA Website

PDP: Preliminary Design Program

PDP is the first reporting stage during the Feasibility Study phase where the District and its team collaborate with the MSBA to document their educational program, generate an initial space summary, document existing conditions, establish design parameters, develop and evaluate alternatives and recommend the most cost effective and educationally appropriate alternatives to the MSBA for further evaluation in the PSR phase.

Module 3 Feasibility Study Guidelines

PSR: Preferred Schematic Design

PSR is the second reporting stage during the Feasibility Study phase where the District and its team collaborate with the MSBA to refine their educational program and space summary, further develop and evaluate alternatives and recommend the most cost effective and educationally appropriate solution to the MSBA Board of Directors for consideration before progressing into Schematic Design.

Module 3 Feasibility Study Guidelines

SD: Schematic Design

SD is the final reporting stage where the District and its team develop a final design program and robust schematic design of sufficient detail to establish the scope, budget and schedule for the Proposed Project.

Module 4 Schematic Design Guidelines

SOI: Statement of Interest

Submitting an SOI is the critical first step in the MSBA’s program to partially fund the construction, renovation, addition or repair of municipality or regionally owned school facilities located in cities, towns and regional school districts. The SOI allows districts to inform the MSBA about deficiencies that may exist in a local school facility and how those deficiencies inhibit the delivery of the district’s educational program.